You are currently viewing Huntingwood Switch Yard Primary & Secondary Works

Huntingwood Switch Yard Primary & Secondary Works

Powercor Network Services awarded PowerNet the construction of the outdoor switchyard, and with early completion was than awarded the rectification works of the entire secondary system. The scope consisted of:

  • Installation works for New 132kV switch yard and transformes
  • 2 new incomer bays with the provision of a 3rd and site supervision on behalf of Powercor network services
  • Installation of 2 new ABB 132kV transformers
  • Installation of 5 132kV circuit breakers, CTs, VTs
  • 12 disconnect switches, earth switches
  • Associated grid earthing and structure earthing
  • Installation of New control room and associated protection panels.
  • Protection panel wiring
  • Earthing of tinned copper bar
  • Basement cable tray