Hume Dam HV cable replacement and transformer primary works

Powercor Network Services subcontracted the following works to PowerNet:

  • Overhead primary construction to the new 132kv Transformers
  • Installation of 6 new 630mm2 copper HV cables over 150m+ from the new transformers down to the generator CB
  • Termination of HV cable (inline jointing and Tx Termination)
  • Up Grade 240 and 415v DB to bring to Standard
  • Installation of Cable supports and new cables
  • Red Line Mark Ups