PowerNet recently installed and commissioned a 1MW / 2MWh BESS. Each container weighing around 21t. With COVID-19 limiting travel from the overseas supplier, PowerNet became the preferred installation team for the project.  

Scope of Works

  • Inspection of BESS containers at arrival for any damages, as per OEM checklist provided
  • Unloading of BESS containers and provide appropriate crainage and lift plans
  • Installation of Core drilling/anchor bolts to fix the BESS containers on the foundations
  • Installation of the air conditioning
  • Install of fire suppression cylinder provided by manufacturer
  • Installation of DC bars between the battery modules
  • Installation of Power and Lighting supplies
  • Supply of blocking material and sealing the container